QLD truckies prepare for Warrego Highway roadworks

Queensland truckies must prepare their journey for detours, as pavement repairs and resurfacing works on the westbound carriageway will be undertaken in two sections, on the Warrego Highway between Kholo Road and Wulkuraka Connection Road, Blacksoil.

  • Subscribe to our free weekly newsletter to receive the latest news and classifieds from Australia’s transport industry.
  • Don’t miss a second and subscribe to our monthly Deals on Wheels magazine.
  • Sell your truck with Australia’s #1 truck classifieds

Works on Warrego Highway, westbound between Kholo Road and Bramers Road will begin 8pm on Sunday August 25 until 5am Thursday September 19, 2024.

Work will be completed from Sunday to Friday from 8pm to 5am nightly.

The Fernvale Road on-ramp to Warrego Highway (westbound), will be closed for three nights between 9pm and 5am.

During these periods, traffic detours will be in effect and heavy vehicles will be directed via appropriate detour signage.

Heavy vehicle operators must do the following:

  1. Loads greater than 3 metres wide are advised to contact Adam Kropp (adam.kropp@fultonhogan.com.au) at least three working days prior to travel.
  2. Operators must also contact on site representative, Denis McCarthy, on 0499701159 (Project Engineer) at least two hours prior to arrival onsite.
  3. On arrival, operators are to stop at the worksite and call Denis McCarthy on 0499701159 prior to travelling through site.

Read more:

Check out the Deals on Wheels Facebook here. 

Send this to a friend